Publication: Scaling Up Renewables in Texas: A Binary Linear Programming Approach to Cost-Effective Integration Under Hourly Supply-Demand Constraints
Files
Date
Authors
Journal Title
Journal ISSN
Volume Title
Publisher
Access Restrictions
Abstract
This study utilizes constrained linear programming with binary variables to optimize the integration of renewable energy sources into Texas’s electricity grid from 2027 to 2032. Our primary goal is to achieve a cost-effective transition by minimizing the Levelized Cost of Energy, while: 1) adhering to a yearly CO2 emissions cap and 2) ensuring that the hourly electricity demand is consistently met by the simulated hourly profiles of renewable energy generation. In guiding this transition, we employ a three phase approach. We begin by identifying the optimal counties for wind and solar energy generation as well as determining the configuration of fossil fuel plants needed to meet 2032 energy demands. Using the optimal counties identified in Phase 1, we then narrow our selection of specific sites for renewable energy production. And then lastly, we establish a detailed timeline for integrating new renewable energy sources and decommissioning fossil fuel plants from 2027 to 2032, ultimately achieving the optimal solution identified in Phase 2. Based on our analysis, we found that the cost-optimal pathway: recommended a front loaded approach to decommissioning fossil fuel plants, prioritized wind site development over solar, and involved an exponential scaling process for wind site development in which about of 80% of new wind site capacity comes online in 2031 and 2032.